Free 30-minute scoping call, no obligation

Get a free quote

+91 78380 40655 · info@vyaparisolutions.com

Cyber Security · Audit · ISO Certification

Compliance that protects revenue, not just records

Vyapari Solutions takes you from gap assessment to certificate — SOC 2, PCI DSS, DPDP, VAPT, CERT-In, HIPAA, GDPR, CMMI and the full ISO management system family — with one accountable team and a fixed timeline.

4.9/5 from compliance leads at 500+ engagements

CERT-In empanelled methodology PCI DSS QSA-led NABCB-aligned ISO practice ISO 27001 certified team
500+Audits delivered
96%Pass on first attempt
20+Countries covered
SOC 2 evidence synced
Compliance posture Live
88%READY
ISO 27001 controls91%
SOC 2 evidence84%
VAPT findings closed96%
0Major NCs
12Weeks to cert
19Frameworks
Recent activity
  • ISO 27001Stage 2 closed · 0 major NCs
  • SOC 2 Type IIEvidence window · day 62 of 90
  • VAPT retest4 high findings closed
AccreditedNABCB · IAF MLA

Illustrative posture view. Yours is built from your own evidence, in your own tools — we do not ask you to move anything into ours.

Frameworks we deliver end to end

ISO 27001 SOC 2 Type II PCI DSS v4.0.1 DPDP Act 2023 GDPR HIPAA ISO 9001 ISO 45001 ISO 22000 CERT-In CMMI Level 5 ISO 22301 NABCB Accredited
ISO 14001 ISO 50001 ISO 13485 ISO 37001 ISO 20000-1 ISO 27701 SOC 1 Type II VAPT Red teaming IAF MLA Cloud security review Fractional DPO
How the work actually runs

Fewer vendors, fewer surprises, one evidence set

The cost of compliance is rarely the certificate — it is the third time your engineers export the same access review for a different auditor.

Single accountable team

One programme instead of four vendors

Security testing, ISO implementation, privacy and sector advisory run off one control library and one project plan — so nobody hands you a gap and calls it someone else’s scope.

  • One evidence request list for your engineers
  • One reporting line, one weekly status
  • One fixed fee agreed before kick-off
Reuse rate
0

of controls shared across frameworks

ISO 27001 and SOC 2 overlap almost entirely. We test once and report many ways.

Turnaround
0

from kick-off to gap report

A board-ready gap analysis with owners, effort and a dated remediation plan.

Evidence-first

Auditors see your systems, not our templates

Every control is mapped to a real artefact from your stack — a ticket, a log, a config export — so audit day has nothing left to discover.

Coverage
0

frameworks under one roof

Eight cyber and regulatory practices plus twelve ISO management system standards.

See all frameworks
Support
0

incident response desk

CERT-In reporting clocks start in six hours. Someone picks up at 3am.

Cyber services
Standard compliance

ISO standards, one integrated management system

Certifying separately means three context analyses, three audit programmes and three sets of audit days every year. We build one system that satisfies all of them, then coordinate a single accredited audit.

  • Shared context, policy, document control and internal audit programme
  • One management review covering every standard in scope
  • Typically 30–40% lower total cost than separate certifications
  • NABCB and IAF MLA accredited certification bodies only
One management system — shared context and scope, a single policy framework, one document control process and one internal audit programme — satisfying ISO 9001, 14001, 45001, 22000, 50001, 13485, 37001, 22301, 27001, 20000-1, 27701 and NABCB accreditation, at 30 to 40 percent lower total cost All twelve standards
Why Vyapari Solutions

The difference between a certificate and a control environment

Evidence-first, not template-first

Every control is mapped to real artefacts from your stack, so audit day has no surprises.

Certification in 8–14 weeks

Parallel workstreams for documentation, remediation and internal audit compress the calendar without cutting scope.

One framework, many certificates

Shared controls are tested once and reused across SOC 2, ISO 27001, DPDP and GDPR to cut cost by up to 40%.

Your data never leaves your control

Assessments run inside your environment with least-privilege access and signed NDAs for every engineer.

No — and that is deliberate. Accreditation rules require independence between the consultant and the certification body.

Why we do not issue the certificate ourselves
Side by side

What changes when the same team owns the whole programme

Six places where compliance projects usually go sideways, and how our engagements are structured to avoid each one.

  1. Scope definition

    Fixed in writing after a free scoping call — sites, headcount, audit days, deliverables

    UsuallyLoosely worded, then re-scoped by change order mid-project

  2. Documentation

    Written against your real processes and signed off by the process owner

    UsuallyGeneric template pack with your logo dropped in

  3. Evidence collection

    Collected once, mapped to every framework in scope

    UsuallyRe-requested separately for each certificate

  4. Who runs the audit

    Independent accredited body — we prepare you and coordinate them

    UsuallySame firm consults and "certifies", which breaks accreditation rules

  5. After the certificate

    Surveillance calendar, internal audits and refreshers included for the cycle

    UsuallyEngagement ends the day the certificate is issued

  6. Pricing

    One fixed fee, agreed before work starts

    UsuallyDay-rate that grows with the project

How we work

From first call to certificate in four stages

Every engagement is fixed-fee and time-boxed. You get the week-by-week plan before you sign anything.

Scoping workshop mapping systems and data flows on a whiteboard
STEP 01

Scope & gap assessment

We map assets, data flows, applicable clauses and regulatory triggers, then quantify the gap in a board-ready report.

A risk register marked up by hand beside two laptops
STEP 02

Design & remediation

Policies, procedures, risk register and technical controls are built with your teams — not handed over as a template pack.

An internal audit interview with evidence shown on a laptop
STEP 03

Internal audit & readiness

A full dry-run audit with evidence sampling, management review and corrective actions before the certification body arrives.

A printed audit report open at the signature page
STEP 04

Certification & surveillance

We coordinate the accredited audit, close findings and keep you audit-ready through annual surveillance cycles.

Get your week-by-week plan Fixed fee, quoted before kick-off
Engagement models

Start where you actually are

Three ways in. Every one of them is fixed-fee, time-boxed and quoted after a free scoping call — never on a day rate that grows.

Gap assessment

Fixed fee · 2–3 weeks

Best first step when you do not yet know what applies

  • Applicability and scope analysis
  • Clause-by-clause control review
  • Board-ready gap report with owners
  • Dated remediation roadmap
  • Realistic budget and timeline
Scope a gap assessment

Managed compliance

Annual retainer

For teams that must stay audit-ready all year

  • Surveillance audit preparation
  • Quarterly internal audits
  • Fractional CISO and DPO advisory
  • Vendor and customer questionnaire support
  • Incident response on retainer
Discuss a retainer
0 Audits & assessments delivered
0 Countries served
0 First-attempt certification rate
0 Incident response desk
Credentials

Who is actually doing the work

Accreditation, empanelment and personal certifications — the things worth checking before anyone signs a compliance contract.

NABCB accredited partners IAF MLA recognised CERT-In methodology PCI DSS QSA-led ISO 27001 certified team Lead auditors (IRCA / Exemplar) Licensed CPA firm network CMMI certified appraisers
Global delivery

Audited from India, accepted everywhere

Certificates issued through IAF MLA signatory bodies are recognised in more than 100 economies. We deliver remotely across 20+ countries with engagement teams in India and the UAE.

India — Noida, Bengaluru, Mumbai, Hyderabad UAE & wider GCC — Dubai, Abu Dhabi, Riyadh United Kingdom & European Union United States & Canada Singapore & wider APAC Australia & New Zealand
Delivery map marking Noida, Bengaluru, Dubai, London, Singapore and New York, with Noida and Dubai ringed as engagement hubs

Delivery hubs in India and the UAE, remote engagement teams across 20+ countries.

Client outcomes

What changes after certification

Vyapari Solutions closed our SOC 2 Type II and ISO 27001 in a single evidence cycle. Two certificates, one audit season, and our enterprise deals stopped stalling in security review.
Rohit MenonVP Engineering, B2B SaaS platform
The PCI DSS v4.0 gap report was the first assessment that our acquiring bank accepted without a single follow-up question. Clear scope, clear evidence, no padding.
Ananya DeshpandeHead of Risk, Payment aggregator
We needed ISO 9001, 14001 and 45001 across four plants. Vyapari Solutions ran an integrated management system so we audit once instead of three times a year.
Vikram ChandraGroup Quality Director, Manufacturing
Questions

Questions we are asked before every engagement

Most organisations reach certification in 8 to 14 weeks. A 50-person SaaS company usually completes ISO 27001 or SOC 2 readiness in 8–10 weeks; multi-site manufacturers with several standards in scope typically need 12–20 weeks. We publish the week-by-week plan before the engagement starts.

No — and that is deliberate. Accreditation rules require independence between the consultant and the certification body. Vyapari Solutions prepares you, runs the internal audit and manages the process, while an accredited certification body or licensed CPA firm performs the final audit and issues the certificate.

No. We build one integrated control set and test shared controls once. Organisations combining ISO 27001 with SOC 2, DPDP or GDPR typically save 30–40% versus running the projects separately, and their teams answer each evidence request only once.

A complete management system: scope and applicability statement, policies and procedures, risk assessment and treatment plan, control implementation evidence, internal audit and management review records, corrective action log, and the auditor liaison through to certificate issue.

Yes. We deliver remotely across 20+ countries from our office in India. GDPR, HIPAA, SOC and PCI DSS work is routinely delivered for clients in the EU, UK, US, GCC and APAC.

Fixed fee per engagement, quoted after a free scoping call. The quote states the standards in scope, sites, headcount, number of audit days and every deliverable, so there are no change orders once work begins. Certification body fees are billed separately by that body.

Still not sure what applies to you?

Ask an assessor directly — we answer scoping questions before anyone talks about a fee.

Free, no obligation

Find out exactly what you need — in 30 minutes

Tell us who is asking for compliance and why. We will map the frameworks that actually apply, the realistic timeline, and a fixed fee. No proposal theatre.

Reply within one business day NDA before any detail is shared No obligation, no proposal theatre